Moped
Full Member
- Posts
- 963
- Likes
- 1,109
Spanish sun mid January through to April. As long as we use 12v only then 100w solar and lead acid in Spain seems ok during this period combined with a bit of touring every 2-3 days.One thing I will say, with your proposed use off grid if it is in the U.K. then for 5 months of the year you will need EHU or a generator unless you are doing a good few hours travelling each day. Lifepo4 are very good if they fit your use I am very pleased with mine but I changed everything to get the best of them. The problem is getting enough charge to replace your usage. If your current system isn’t doing it on lead acid then nothing will change except you initially get longer before running low on power.
I did note you mention France and Spain though so if your 5 months poor U.K. solar is spent there you could be okay but uorating your solar. You need to be able to replace what you use though![]()
RoadPro did say that because of Lithium ability to take a rapid charge, if insufficient daily sun for solar, then you might only need to run the engine alternator for 20 mins to offer a very good top up for the next days use if you happen to be static for a few days. But yes agree solar harvesting would need to increase for serious off grid use.
I accept the wear on the engine argument and diesel use but it is not as if we do even 10000 miles a year so in the grand scheme of things the wear over time is not significant but I may be right or wrong of course!
How idling affects the diesel emissions systems these days is in the lap of the gods.
Last edited: